1 |
Building Plan Approval for new establishments - Need for uniform industrial building bye laws for SIDA and DLDAs |
State |
Housing Department |
SIDA has updated its bye laws. Housing Department has accepted the same |
|
Resolved |
2 |
District Magistrate should be authorized to give permission to purchase land under section 154 of ZA&LR Act |
State |
Directorate of Industries |
Order issued for adoption of new MSME definition, thus DMs are authorized to give permission to purchase land upto INR 50 Cr |
|
Resolved |
3 |
Under Mega Industrial and Investment Promotion Policy - 2015, timeline extension for commencement of commercial production for availing financial incentives |
State |
Directorate of Industries |
Timeline extended to 30th September 2022 |
|
Resolved |
4 |
Notification of revised and updated Mega Industrial and Investment Policy with extended validity period at the earliest |
State |
Directorate of Industries |
Uttarakhand Mega Industrial & Investment Policy is extended till 31st March 2025 |
|
Resolved |
5 |
For expansion in existing industrial units under Mega Textile Park Policy – 2014, provision of 25 percent additional fixed capital investment should be made |
State |
Directorate of Industries |
The provision of 25% expansion is included in the Mega Textile Park Policy 2014. Order issued on 23rd Dec 2021 |
|
Resolved |
6 |
Incentives provided in the policies should not be discontinued |
State |
Directorate of Industries |
Direction has been issued to industries department for policy continuity and stability |
|
Resolved |
7 |
Production Linked Incentives and employment promotion should be included in industrial policies |
State |
Directorate of Industries |
Employment based incentives are already being provided under Mega Industry and Investment Promotion Policy - 2015 the proposed policies will be labour intensive |
|
Resolved |
8 |
In Purchase Preference Policy, at least 50 percent Purchase Work Orders to the State MSE & Start Ups |
State |
Directorate of Industries |
The procurement of 25 percent from MSEs and Startups has been included in State Procurement Rules |
|
Resolved |
9 |
Automatic benefits to all registered MSMEs without separate registration in Purchase Preference Policy |
State |
Directorate of Industries |
|
|
Resolved |
10 |
Strict adherence to the Purchase Preference Policy by State Departments |
State |
Directorate of Industries |
After incorporation of necessary provisions in the Procurement Rules, the departments are expected to adhere to these Rules |
|
Resolved |
11 |
Mandatory procurement through GEM Portal |
State |
Directorate of Industries |
An order has been issued for mandatory purchase via GEM Portal |
|
Resolved |
12 |
Under Uttarakhand Enterprises Single Window Facilitation and Clearance Act, 2012, Clearances should be issued within timeline and monitoring at higher level |
State |
Directorate of Industries |
DG & Commissioner, Industries has been authorized to approve projects at the State Level and DMs are instructed appropriately |
|
Resolved |
13 |
State/ District level Udyog Mitra meetings need to be convened on a regular basis |
State |
Directorate of Industries |
Letter from Chief Secretary sent to District Magistrates. The instructions were reiterated to DMs during the VC held on 12-11-2021. Online portal is developed to record Udyog mitra meetings |
|
Resolved |
14 |
Benefit on exemption of stamp duty charges should be admissible as per In-Principle approval from State/ District Level Empowered Committee under MSME Policy |
State |
Directorate of Industries |
Provisions made in the Single Window System |
|
Resolved |
15 |
Validity of Industrial Development Scheme – 2017 (valid up to 31st March 2022) should be extended for additional 3 years |
State |
Directorate of Industries |
Letter sent from Honble Industry Minister to Minister of Commerce and Industry, GOI Another letter from Chief Secretary to Secretary DPIIT has already been sent |
|
Ongoing |
16 |
Under Industrial Development Scheme, duration for the commencement of commercial production should be extended for 3 years, after pre-registration |
State |
Directorate of Industries |
GOI has extended the timeline to 3 years from 18 months Decision taken in high powered committee; notification is awaited |
|
Ongoing |
17 |
Re-establishment of regional office of DGFT at Dehradun |
State |
Directorate of Industries |
Letter has been sent to DGFT from Secretary Industries A letter has also been submitted from Honble CM to Commerce and Industry Minister, GOI |
|
Resolved |
18 |
Appointment of Economic officer in each district |
State |
Directorate of Industries |
This point was discussed in detail in SLBC meeting as well as in the meeting chaired by Chief Secretary. GMDIC, DDM NABARD and LDM can together work in drawing up economic development plan for the districts under the guidance of District Magistrates. |
|
Resolved |
19 |
Completion Certificate should be issued expeditiously by SIDA |
State |
Directorate of Industries |
All pendencies are cleared |
|
Resolved |
20 |
Transfer levy rates should be reduced in SIIDCUL industrial areas |
State |
Directorate of Industries |
Transfer levy rates are reduced from 15 to 5 % in SIIDCUL industrial areas |
|
Resolved |
21 |
Centralized firefighting system needs to be operationalized in Haridwar |
State |
Directorate of Industries |
Not required |
|
Resolved |
22 |
Plots allocated in departmental industrial estates should be transferred to freehold |
State |
Directorate of Industries |
SIIDCUL : A committee was constituted by the SIIDCUL board to look into the matter. Department of MSME : File to be referred to Secretary Industry |
|
Resolved |
23 |
Reconstruction of road from Sitarganj to Aldeco-SIIDCUL Industrial Park needs to be widened, and from Aldeco-SIIDCUL Industrial Park, Sitarganj to Chorgalia |
State |
Directorate of Industries |
Aldeco - SIIDCUL Industrial Park is under progress Chorgalia - Sitarganj is completed |
|
Ongoing |
24 |
Rationalize rates of SIIDCUL land parcels - New Plots are expensive than the resale plots |
State |
Directorate of Industries |
The rates of new plots are not high |
|
Resolved |
25 |
Permission from SIIDCUL is required to change Bank for mortgaging, this permission is provided by FC. RMs can be authorized to provide this permission |
State |
Directorate of Industries |
An order is issued to authorize RMs to issue permission |
|
Resolved |
26 |
Necessary steps to be taken to avoid traffic congestion in SIIDCUL area (Nestle crossing) |
State |
Directorate of Industries |
Manpower is deployed to monitor the traffic congestion |
|
Resolved |
27 |
Expedite the construction of building for Associationss office space (SIT Issue) |
State |
Directorate of Industries |
An order is issued to all SIIDCUL RMs to provide conference rooms for association meetings |
|
Resolved |
28 |
Construction of 200 mtr road & bridge to ease the approach for ESI Hospital |
State |
Directorate of Industries |
SIIDCUL agreed to construct the road & bridge till the boundary of ESI hospitals Primary estimate is provided by PWD of 3.47 Cr, financial approval is received |
|
Ongoing |
29 |
Provision for plots to EWS |
State |
Housing Department |
Total 21 EWS projects consisting of 17304 EWS units are sanctioned by the Central Government. 2 projects, Ukrauli-Sitargnaj (1168), Kanakpur-Kashipur (1256) inaugurated by the Hon’ble Prime Minister on 30.12.2021 464 EWS units has been completed & |
|
Ongoing |
30 |
Develop new Warehouses |
State |
Directorate of Industries |
SIIDCUL Board has approved Warehouses to be considered as Industries Land parcels are identified in Industrial areas for the construction of warehouses |
|
Resolved |
31 |
Expedite the maintanence work of road in SIIDCUL Industrial Area (Pantnagar) |
State |
Directorate of Industries |
The maintenance work has been completed |
|
Resolved |
32 |
Delegate the power to RM SIIDCUL to spend amount for maintenance work in SIIDCUL area |
State |
Directorate of Industries |
Notice issued by MD SIIDCUL on 2-12-2021 to delegate power to spend upto INR 25 Lakh for maintenance |
|
Resolved |
33 |
Display Udhyog bandhu meeting minutes on dashboard |
State |
Directorate of Industries |
The provision is developed in Single Window System |
|
Resolved |
34 |
Revision of land allotment rates for Industrial Estates |
State |
Directorate of Industries |
Land Allotment rates has been revised and it is now linked with existing circle rates |
|
Resolved |
35 |
Provision to increase height limit of Air Handling Unit |
State |
Directorate of Industries |
SIDA Bye Laws have the provision of 2.4 mtr AHU height. The height can be increased in case to case basis |
|
Resolved |
36 |
Investors are unable to track the Status of their IDS claim |
State |
Directorate of Industries |
An online provision is enabled in Single Window System to track the status |
|
Resolved |
37 |
Incentivize Land Use Change charges |
State |
Directorate of Industries |
Housing Department has reduced Land Use Charges prominently |
|
Resolved |
38 |
CETP in Bhagwanpur |
State |
Department of Revenue |
Bhagwanpur Association to identify land. SIIDCUL will facilitate in establishing the CETP |
|
Pending |
39 |
Distribution of natural gas in Industrial areas |
State |
Directorate of Industries |
HNGPL has started the work to lay gas pipeline |
|
Resolved |
40 |
i. Ground coverage need to be increased in consideration of setbacks and fire safety norms, requirement of green spaces and objective needs to be defined ii. Requirement of minimum road width for granting building plan approval in rural and hilly are |
State |
Housing Department |
Proposed Ground Coverage of 55-65% Meeting held between Secretary Housing and Secretary Tourism on 20/11/2021. Chief Town Planner and tourism department are working to rationalize road width for resorts and theme-based resorts |
|
Resolved |
41 |
Differences in the building approval charges between SIDA and all the DLDAs. Labour Department to adopt the provisions as per The Building and other construction workers welfare cess rules 1988 |
State |
Department of Labour |
The proposal to revise Labour Cess is forwared to Government of India |
|
Ongoing |
42 |
Ambiguity with regard to jurisdiction of Area and map approving authority. Need to be defined with proper justification and modalities SIDA should be authorized for Map approval for all the Industries (outside Industrial area as well) |
State |
Housing Department |
1. There is no ambiguity with regard to jurisdication of Development Area and SIDA areas. As per the notifications, the SIDA and Authoritys area jurisdication is clear 2. For suspended area, the map approval is made optional for the time being and th |
|
Ongoing |
43 |
Industrial estates developed in the earmarked areas of Master Plan need to be notified as industrial areas |
State |
Housing Department |
Notification has already been done as per the norms of Private Industrial Estate Policy |
|
Resolved |
44 |
Develop Transport Nagar |
State |
Housing Department |
1- Kashipur (Udham Singh Nagar)- As informed by DLDA, there is no land available in Kashipur. 2- Bhagwanpur (Haridwar)- As informed by DLDA, there is no land available in Bhagwanpur. 3- Rudrapur- 46.88 Acre of land transferred to the DLDA US Nag |
|
Ongoing |
45 |
Micro and Small Enterprises (MSEs) do not fall under applicable category of Fire NOC but are compelled to get the No Objection Certificate (NOC) by the fire department (Mandatory requirement as per UBBL 500sq.mt. or more covered area in non-residenti |
State |
Uttarakhand Fire and Emergency Services |
Amendments made in Ordinance (building having a height more than 15 mts and covered area of more than 500sqmt is required to obtain NOC) |
|
Resolved |
46 |
Extend the validity period of Fire No Objection Certificate (NOC) |
State |
Uttarakhand Fire and Emergency Services |
GO issued for extending the validity from 1 to 3 years |
|
Resolved |
47 |
Provision for availability of facilities of firefighting should be made in Bahadrabad |
State |
Uttarakhand Fire and Emergency Services |
At present department is operating in coordination with SIIDCUL, as per demand. Proposal is sent to government for establishment of new fire station in industrial area Bahadrabad on 07/02/2022. (Land is available in Bahadarabad Industrial Area) Appro |
|
Ongoing |
48 |
Regular monitoring of all fire equipment in all Industrial Estates |
State |
Uttarakhand Fire and Emergency Services |
Monitoring is done on regular basis |
|
Resolved |
49 |
Fire NOCs need to be issued expeditiously for Solar power projects |
State |
Uttarakhand Fire and Emergency Services |
FIRE NOC not required for Solar projects |
|
Resolved |
50 |
Develop Fire station at Lakeshwari |
State |
Uttarakhand Fire and Emergency Services |
Fire unit is operating in Lakeshwari area . A proposal is sought to upgrade the existing Fire Unit to Fire Station |
|
Ongoing |
51 |
Revamp Fire Stations in Roorkee |
State |
Uttarakhand Fire and Emergency Services |
Fire Station Roorkee at present Fire Station Civil Line is operated in Kotwali premises, due to non-availability of land for the construction of new fire station. Proposal shared by the department |
|
Ongoing |
52 |
Status and rationalization of base rates of land |
State |
Stamp & Registration |
The Circle rates are revised |
|
Resolved |
53 |
Change of Land Use (Sec 143 of ZA&LR) should be recorded in the revenue records on Suo-moto basis on the issuance of In-Principle approval from State/ District Level Empowered Committee |
State |
Department of Revenue |
Relevant amendments are made in UP ZA & LR Act |
|
Resolved |
54 |
Department is required to expedite the Mutation of land/ property in districts. Because of the non-adherence of timely mutation, industries are facing difficulties in getting bank loans |
State |
Department of Revenue |
Orders issued to DMs Assessment of status of mutation in the districts |
|
Ongoing |
55 |
Establishment of Skill Development Council |
State |
Department of Skill Development, Employment and Entrepreneurship |
Order has been issued by the State Skill development Mission requesting GoI (NSDC) to set up GoI Skill Mission(s) in Uttarakhand |
|
Resolved |
56 |
Establishment of data base for providing skilled / semi skilled manpower to industries |
State |
Department of Skill Development, Employment and Entrepreneurship |
Mission has created data base of all the beneficiaries skilled through various schemes run by Mission through its MIS online portal |
|
Resolved |
57 |
Skill Gap Analysis |
State |
Department of Skill Development, Employment and Entrepreneurship |
Impact Evaluation of Existing Skilling Programs and Study of Gaps and Trends in Skills Sector in Uttarakhand was conducted by UKSDM (Completed) |
|
Resolved |
58 |
Maintenance and upkeep of sub stations in all Industrial Areas |
State |
Uttarakhand Power Corporation Limited |
– Maintenance work of all sub-stations have been undertaken at regular intervals – Capacity building has also been undertaken at Raipur, Sarwarkheda |
|
Resolved |
59 |
Special attention to maintain the health of 11 KVA Rural / Mixed Feeders (non-continuous power supply) in US Nagar |
State |
Uttarakhand Power Corporation Limited |
– Jaspur has been upgraded from Rabbit Conductor to Dog Conductor – Construction of new 33 KV Bay is proposed at 33/11 KV Mahuakhedaganj-I substation has been awarded in March 2023. Construction to be completed within 6 months – Proposal for 33 KV su |
|
Ongoing |
60 |
Construction work to establish approved 132KVA power sub-station in Kashipur |
State |
Uttarakhand Power Corporation Limited |
Kashipur (132 KV Substation) Land is identified. PTCUL is in process of purchasing land. DPR is prepared for the project. Tender to be floated by end of July 2023 |
|
Ongoing |
61 |
Construction of power sub-station needs to be expedited at Aldeco-SIIDCUL Industrial Park, Phase-2, Sitarganj |
State |
Uttarakhand Power Corporation Limited |
Construction of 3 , 33 KV substations are proposed at Eldeco SIIDCUL Industrial Park. M/s UP Nirman Nigam is constructing these Substations for SIDCUL under supervision of UPCL, which is under progress. (Ongoing) UPCL has already constructed associ |
|
Ongoing |
62 |
Construction work to establish approved 132KVA power sub-station in Selaqui |
State |
Uttarakhand Power Corporation Limited |
Tender for the construction work of 220 KV substation (instead of 132 kv) in Selaqui has been floated. ADB will fund this project |
|
Ongoing |
63 |
Funds collected through increase in electricity duty in last three years, should be transferred to UPCL for development of infrastructure |
State |
Uttarakhand Power Corporation Limited |
The fund is transferred to GoUK |
|
Resolved |
64 |
Ensure regular supply of power during monsoon in Haridwar region |
State |
Uttarakhand Power Corporation Limited |
To avoid frequent trippings in the Industries during monsoons maintenance of all the industrial feeders are proposed twice one before the monsoon and another during monsoon period. Further to avoid moisture in cable jointing kit, CT/PT units of meter |
|
Resolved |
65 |
UPCL should make a provision to purchase the surplus solar power remaining after the consumption by industry |
State |
Uttarakhand Power Corporation Limited |
Roof top solar power plants being captive in nature are installed for self usage and support of grid is provided for stability of the plant and any surplus energy could not be forced upon UPCL especially when the net energy benefits are already been |
|
Resolved |
66 |
Exemption of green energy cess from industrial units purchasing electricity from open access |
State |
Uttarakhand Power Corporation Limited |
Discrimination between power supplied by UPCL and from Open Access could not be made as no additional benefit can be passed upon the consumers for not taking power from the State Discom, hence cess should have to be imposed uniformly. |
|
Resolved |
67 |
Provision for Sub-meter for industries |
State |
Uttarakhand Power Corporation Limited |
The provision for sub meter has been enabled |
|
Resolved |
68 |
Power Trading : The companies should get a refund if number of units consumed are more |
State |
Uttarakhand Power Corporation Limited |
The energy bills are prepared and raised only against the net energy supplied by UPCL after adjustment of open access energy (if any). |
|
Resolved |
69 |
# Develop new 132 and 33 KV station demand in Bhagwanpur # Charge Sikandarpur Station |
State |
Uttarakhand Power Corporation Limited |
Land is being identified by PTCUL & UPCL for 132 KV & 33 KV substation respectively Sikandarpur substation has been charged by alternate arrangement (Main line will be constructed by August 2023) |
|
Resolved |
70 |
Enhance capacity of existing Transformers in Pantnagar Installing a transformer of 12.5 MVA instead of 8 MVA in Lalpur |
State |
Uttarakhand Power Corporation Limited |
Transformers are upgraded from 8 MVA to 12.5 MVA Lalpur : 29-12-2021 Danpur : 26-12-2021 |
|
Resolved |
71 |
The industries face frequent tripping issues during monsoons |
State |
Uttarakhand Power Corporation Limited |
Issue will be resolved by installation of heaters Maintenance of feeders are proposed twice(before monsoon & during monsoon) |
|
Resolved |
72 |
Simplification of procedure for Electricity connection transfer and load enhancement |
State |
Uttarakhand Power Corporation Limited |
No provision for Electricity Connection Transfer in the Regulations UPCL has already simplified procedure for Load Enhancement within 15 Days |
|
Resolved |
73 |
Provision for availability of water facilities should be made in Bahadrabad |
State |
Uttarakhand Jal Sansthan |
The department is preparing DPR. The proposal will be forwarded for approval. |
|
Ongoing |
74 |
Improve the drainage system in Bhagwanpur Industrial Estate |
State |
Uttarakhand Irrigation Department |
Department has prepared a DPR. A proposal of INR 44.65 Cr is forwarded for approval. The work is expected to be completed in 2 years |
|
Ongoing |
75 |
In case of amendments or changes in process, technology, product mix etc. made by the industries; accordingly, the process of modification in CTE/CTO in State’s Pollution Control Board should be simplified |
State |
Uttarakhand Pollution Control Board |
Meeting held with IAs to resolve issues on 6-12-2021 |
|
Resolved |
76 |
Rules/regulations regarding environmental compensation at the time of inspection should be simplified |
State |
Uttarakhand Pollution Control Board |
Meeting held with IAs to resolve issues on 6-12-2021 |
|
Resolved |
77 |
The provision to make amendments in the submitted application should be given to the industries as currently no unit is allowed to make any changes in the application form unless the first application is disposed/rejected |
State |
Uttarakhand Pollution Control Board |
Necessary changes incorporated in the system |
|
Resolved |
78 |
Consent fee for issuing No objection certificate (NOC) and Consent to Operate (CTO) need to be rationalized and reduced |
State |
Uttarakhand Pollution Control Board |
Rates are fixed in 2005 and is nominal Meeting was held with IAs and a proposal was sought from them |
|
Resolved |
79 |
Validity period must be mentioned in the renewal certificate of Consent to Operate (CTO) |
State |
Uttarakhand Pollution Control Board |
Necessary changes incorporated in the system |
|
Resolved |
80 |
Power to issue consent by regional offices of Pollution Control Board should be increased from Rs. 5 crores to Rs. 25 crores |
State |
Uttarakhand Pollution Control Board |
|
|
Resolved |
81 |
Training and capacity building sessions on single window and PCB’s new portal (OCMMS) need to be organised |
State |
Uttarakhand Pollution Control Board |
Conferences are being organized on regular basis |
|
Resolved |
82 |
Industrial units located outside SIIDCUL area should be connected to common effluent treatment plant (CETP) located in SIIDCUL |
State |
Uttarakhand Pollution Control Board |
Letter issued by SIIDCUL to RMs to allow connecting the the units outside SIIDCUL area Order to be published in Websites & circulated to industries |
|
Resolved |
83 |
Guidelines issued regarding the ban on single use plastic by Forest and Environment Department are not being enforced/implemented properly on ground |
State |
Uttarakhand Pollution Control Board |
Workshops organized with field staff to disseminate instructions |
|
Resolved |
84 |
Inspection under UKPCB |
State |
Uttarakhand Pollution Control Board |
Inspections are being conducted on complaint basis only |
|
Resolved |
85 |
Ensure quality of treated water from CETPs are as per the prescribed standards |
State |
Uttarakhand Pollution Control Board |
Already being done, UKPCB is monitoring it on regular basis |
|
Resolved |
86 |
Permission to transport effluent through tankers |
State |
Uttarakhand Pollution Control Board |
The permission is given to transfer effluents |
|
Resolved |
87 |
Concerned State department should bear the expenses incurred during third party inspections |
State |
Uttarakhand Pollution Control Board |
Department has adequate staff for inspections |
|
Resolved |
88 |
Enable options for multiple vendors to dispose Biomedical waste - (Bharat Oil is a single source) |
State |
Uttarakhand Pollution Control Board |
Interstate movement of hazardous waste (except Landfillable waste) is permitted 14-15 vendors are available for 89% waste Only 11% is lanfillable |
|
Resolved |
89 |
Uttarakhand Biodiversity Board – notices are being served to the units which are not covered under the Bio Diversity Act |
State |
Uttarakhand State Biodiversity Board |
2 Workshops held with IAs The language of the notices is also revised |
|
Resolved |
90 |
Closure certificate from Biodiversity Board. The companies are being served notices again & again, they should be given a Closure Certificate after inspecting that unit first time |
State |
Uttarakhand State Biodiversity Board |
|
|
Resolved |
91 |
Validity period of Methanol License needs to be increased from 1 year to 5 years |
State |
Excise Department |
The procedure to avail Methanol License is made online. Validity can not be increased as it is govern by Central Act |
|
Resolved |
92 |
Rationalize fees for Renewal of Distillery License |
State |
Excise Department |
The fees for renewal of Distillery license is revised |
|
Resolved |
93 |
Expedite the process for formulation of policy framework to promote Hemp Industry |
State |
Department of Horticulture & Food Processing |
The revised draft (Hindi and English) of Cultivation, Processing/Extraction and Product Manufacturing Rules 2023 has been submitted to the Secretary, Agriculture and Farmers Welfare Department , Government of Uttarakhand, for perusal and necessary ac |
|
Ongoing |
94 |
Improve the drainage system (kalyani river channelization) |
State |
Directorate of Industries |
Cleaning of Kalyani river is completed. |
|
Resolved |
95 |
Priority for repair and maintenance of roads, drainage and streetlights in industrial areas of Kashipur and Bajpur |
State |
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. |
WAPCOS has been assigned the work of maintenance. Will be completed by Oct2022 |
|
Ongoing |
96 |
Maintenance and repair of roads leading from Mahuakhedaganj railway crossing to Khaikheda is decaying and is broken down |
State |
Uttarakhand Public Works Department |
Mahuakhedaganj railway crossing to Khaikheda – ( Total length of Road 24,850 KM, Damage 8.5 KM) Reconstruction of Road 10 – 13.7KM (2.70 KM, Cost 498.77 Lac) - Approval awaited at Govt. level Reconstruction of Road 13.7 – 16.0 KM (2.30 KM, Cost 452.6 |
|
Ongoing |
97 |
Reconstruction of connecting roads to the private industrial estates located at Mahuakhedaganj (Kashipur) |
State |
Uttarakhand Public Works Department |
Mahuakhedaganj Industrial Area (PWD Road) Details: MPDG Road (Bajpur) – Length 0.990 KM, Cost INR 1.66 Lac) – Approval awaited at Govt. level Kashipur Dadiyal Marg - Length 2.83 KM, Cost INR 343.30 Lac) – Approval awaited at Govt. level Mahuakhedagan |
|
Ongoing |
98 |
Construction of national highway ISBT to Rispana bridge need to be completed expeditiously |
State |
Uttarakhand Public Works Department |
Work is in progress |
|
Ongoing |
99 |
Improve the conditions of Road in Bhagwanpur area |
State |
Uttarakhand Public Works Department |
Department has prepared a DPR. A proposal of INR 44.65 Cr is forwarded for approval. The work is expected to be completed in 2 years |
|
Ongoing |
100 |
To promote Ayurveda/ Ayurvedic Medicine Manufacturing industries, updated documentation and transparent standards for the manufacturing, trials, quality check need to be enforced by the Department of Ayurveda |
State |
Directorate of Ayush |
Licences for Ayurvedic medicine manufacturing units is processed under Drug and cosmetic act 1940 governed by GoI. Establishment of Ayurveda an online portal (e-aushadhi portal) for all licencing process is being developed by Ministry of Ayush G |
|
Resolved |
101 |
Standards and practices should be interpreted on objective basis / An online system for availing Ayush Services |
State |
Directorate of Ayush |
E-aushadhi portal is being developed by GoI. It will be functional soon. |
|
Ongoing |
102 |
Concerned State department should bear the expenses incurred during third party inspections |
State |
Department of Labour |
Department cannot bear the expenses incurred on third party inspections |
|
Resolved |
103 |
Establish a State ESI Board for effective utilization of ESI Hospitals - operating 24*7 / availability of Doctors |
State |
Department of Labour |
State ESI Board is already established |
|
Resolved |
104 |
Provision of flexible work hours for Female workers (Not allowed to work at night if less than 2/3rd of the total workforce) The conditions are stringent |
State |
Department of Labour |
The provision is enabled in "The Factories Act 1948". The necessary amendments will be made in The Shops & Establishment Act 1948 soon Department to evaluate |
|
Pending |
105 |
Concerned State department should bear the expenses incurred during third party inspections |
State |
FCS - Legal Metrology Department |
No provision for Third Party inspections |
|
Resolved |
106 |
The ban (No Entry) enforced on Rudrapur-Nainital National Highway No – 87, Need to be uplifted |
State |
District Administration |
To maintain traffic rule and avoid any road accident in specified area, No entry ban remains to continue from 7am to 10pm (excluding vehicle on emergency duty) |
|
Resolved |
107 |
Make online system for : Permission for Solvent (MA4 & MA5) (To be involved in EoDB & RCB) |
State |
Excise Department |
Online system is developed |
|
Resolved |
108 |
Make online system for availing: Permission for approval of Solar Panel |
State |
Uttarakhand Renewable Energy Development Agency |
The State department does not have any dedicated scheme / policy for the allotment of Solar Projects, so the provision for making the process online is not viable |
|
Resolved |
109 |
Allow routing of Optical Fibres on Transmission Towers |
State |
Power Transmission Corporation of Uttarakhand Ltd. |
600 kms optical fibres are routed in the transmission network. The process to route 900 kms is under process |
|
Ongoing |
110 |
Biodiversity Board: Make Online System: For issuing Notices & Investor response |
State |
Uttarakhand State Biodiversity Board |
Payment integration is left which is from the bank side |
|
Ongoing |
111 |
Illegal functioning of warehouses in SIDC areas |
State |
Directorate of Industries |
SIIDCUL has sent notice to all the units |
|
Resolved |
112 |
Reallotment of vacant plot and shut down unit |
State |
Directorate of Industries |
Policy for reallotment is approved by SIIDCUL Board |
|
Resolved |
113 |
The States MSME Policy is valid till March 2023. The policy incentives should be continued |
State |
Directorate of Industries |
The Department has drafted the new MSME Policy and is put up for Cabinet Approval. The duration of existing MSME policy has been extended till June 2023 |
|
Resolved |
114 |
Business Process Engineering of SIIDCUL services |
State |
Directorate of Industries |
Department is simplifying the process of availing the services |
|
Resolved |
115 |
The State should draft Eco Tourism Policy for conserving the environment of the State |
State |
Department of Tourism |
Uttarakhand Eco Tourism Policy is being co-drafted by Uttarakhand Forest & Tourism Department |
|
Ongoing |
116 |
Centre of Excellence for Ayurveda |
State |
Directorate of Ayush |
Proposal to establish All India Institute of Ayurveda (The most premier institute of Ayurveda) in Uttarakhand, already submitted to Gol. Department is also seeking private investors to established variour Ayush related Projects. |
|
Ongoing |
117 |
Provision for allotment of land for Small & Medium category industries |
State |
Directorate of Industries |
SIIDCUL is developing 2 MSME parks in Kashipur & Bajpur |
|
Ongoing |
118 |
Draft a policy to Incentivize Plastic recycling units of the State |
State |
Directorate of Industries |
Alternative for Single Use Plastic Policy 2023 has been issued |
|
Resolved |
119 |
Registration under Plastic Waste Management Act 2016 (Amended -2022) The Registration Fee & Processing Fee is INR 10,000 & INR 2,500 respectively. The renewal fee is also same for MSME & large industries. The fees for MSME units should be reduced |
State |
Uttarakhand Pollution Control Board |
The existing fee structure for applications is developed by Central Pollution Control Board |
|
Resolved |
120 |
Increase the validity period of FL - 43 and NDLD license |
State |
Excise Department |
|
|
Pending |
121 |
It was discussed that timely approvals are important in Excise department as beyond a defined timeline the industry will come under legal ambit. Therefore, deemed approval provision for Excise services was discussed |
State |
Excise Department |
|
|
Pending |
122 |
Simplify the procedure & reduce the fee to establish Pulveriser plant under the "Stone Crusher Policy 2019" The permission can be given by District Magistrate |
State |
Geology and Mining Unit |
The Department has drafted "Stone Crusher Policy 2021" wherein an investor can file a single application for Stone crushing, establishment of pulveriser plant and the approval for collection centre of soap stone The Department has also reduced the |
|
Pending |
123 |
Department to explore the possibility of continuing with mining/ dredging (except in river bed) during monsoons also and present a proposal |
State |
Geology and Mining Unit |
|
|
Pending |
124 |
The tax on export of services is 18%. Out of these there are some services wherein the calculation of tax is done at 5%. At the time of refund, the calculation should be done at the original amount. |
State |
Commercial Tax Department |
|
|
Pending |
125 |
The leesa collection centres are not available in the hilly areas, therefore the transport cost is incurred Department to open financially viable Satellite depots at Districts and ensure districbution of Leesa through these depots |
State |
Uttarakhand Forest Department |
|
|
Pending |
126 |
Improve the drainage system at Ramnagar & Salempur Rajputana Roorkee Industrial Estates |
State |
Uttarakhand Irrigation Department |
|
|
Ongoing |
127 |
Power, Forest & Industry department to collaborate & draft Energy generation through Biomass Policy |
State |
Directorate of Industries |
|
|
Pending |
128 |
The industries demanded purchase of surplus power and removal of upper cap for Captive Power Plant (Existing cap is of 1 MW) |
State |
Uttarakhand Power Corporation Limited |
|
|
Resolved |
129 |
Department to establish on online mechanism to monitor the status of power generated, transmission lines, demand and supply |
State |
Uttarakhand Power Corporation Limited |
Already a mechanism in place SCADA for monitoring the status of power generated by UJVNL power houses, load on trasmission lines of PTCUL and status of drawl vs schedule on inter-state points |
|
Resolved |
130 |
Solar Stations are developed but the lines are not transmitted (PTCUL) |
State |
Uttarakhand Power Corporation Limited |
|
|
Pending |
131 |
The departments should procure Steel from local manufacturing units which comply the Bureau of Indian Standars regulations setup by Ministry of Steel |
State |
Uttarakhand Irrigation Department |
|
|
Resolved |
132 |
New ingredients are getting approvals in other States and were given approvals prior in Uttarakhand as well |
State |
Directorate of Ayush |
New combinations/drugs are being approved every Wednesday by technical panel. |
|
Resolved |
133 |
The industries demanded formulation of policy for marketing support of small Ayush units. |
State |
Directorate of Ayush |
Department is establishing wellness portal for registration of all Ayush/Wellness units where all good performing centers will be promoted on the basis of their rating. For marketing of manufacturing units, Ministry of Ayush, Gol provided 50 percent |
|
Ongoing |
134 |
An expert from Industry may be included in the Technical Panel .The queries raised by the panel should be based on some guidelines |
State |
Directorate of Ayush |
Technical panel is formulated on the basis of Ministry of Ayush. Govt. Of India guidelines |
|
Resolved |
135 |
Trade Centres should be established to assess Demand & Supply gap |
State |
Directorate of Ayush |
Trade centers can be established by Dep of Horticulture or Dep. Of Industries to connect cultivators and manufacturing units. Presently. cultivation of herbs is under the purview of Dept. Of Horticulture. |
|
Ongoing |
136 |
Government land may be leased out for cultivation of herbal / medicinal plants |
State |
Directorate of Ayush |
Presently, cultivation of herbs is under the purview of Dept. Of Horticulture. Dept of Industries, Dept. Of Horticulture can do the needful. Herbal gardens are being established in every Govt. Hospital (Health and Wellness Center) |
|
Ongoing |
137 |
Testing Labs: The need for setting up of testing labs was discussed. Department to prepare proposal for upgradation of Rishikul university lab |
State |
Directorate of Ayush |
There are already 6 Ayurveda Drug testing labs in Uttarakhand. Proposal for upgradtion of Rishikul Drug testing laboratry has been sent to the Government |
|
Ongoing |
138 |
. Biodiversity Board : The board issues notifications to Ayurvedic units even though they are not under the purview of their Act |
State |
Uttarakhand State Biodiversity Board |
|
|
Resolved |
139 |
Gazette of 2021: The industries shared their concerns about the amendments done by GoI in the last Gazette. The industries have to pay one time renewal fee of all the products |
State |
Directorate of Ayush |
Licences for Ayurveda manufacturing units is processed under Drug and cosmetic act 1940 governed by GoI. All Standards are prepared/revised monitered by Ayush Ministry, Gol. It is not possible to amend the act at state level. |
|
Resolved |
140 |
Homeopathy : Demand for Govt lab to certify the nano particles in homeopathy medicines |
State |
Directorate of Ayush |
|
|
Pending |
141 |
Uttarakhand should organise one International Conclave on MSME Growth Summit 2023 for Pushing Sustainable MSME Growth in Uttarakhand |
State |
Directorate of Industries |
It is proposed to be in held in Oct/Nov 2023 |
|
Ongoing |
142 |
Calculation of Stamp Duty based on Circle Rate : GPS mapping of any land / asset for calculation of circle rate Ambiguity in case of Circle Rate |
State |
Commercial Tax Department |
|
|
Pending |
143 |
Uttarakhand (the UP ZALR Act, 1950) (Adaptation and Modification Order, 2001). - Government should not make any further amendment in the Act which may derail the progress of Investments |
State |
Department of Revenue |
|
|
Pending |
144 |
Purchase Preference Policy - State units should be given 50% preference in all State Governments & State PSU tenders |
State |
Directorate of Industries |
|
|
Resolved |
145 |
Inspector Raj Khatma - All future inspections under various Acts & Code should only be for hazardous Industries under Factory Act and for industries against whom any genuine complaints are lodged |
State |
Department of Labour |
Inspections of Factories/Industrial Establishments are carried on the basis of computerized random selection as per the directions of the Government of India complaint based inspections are done with the prior permission of HOD |
|
Resolved |
146 |
Renewals & Sanctions All renewal for 2021-22 / 2022-23/2023-24 like Fire NOC Renewal , Factories Act Renewal, Pollution Consent etc should be automatic for next 3 years |
State |
Department of Labour |
Provisions already made vide notification no : 1078/VIII-1/2020-04; 2015-TC-II dated 20.01.2021 for deemed renewal of license of factories under the Factories Act for a maximum 10 years |
|
Resolved |
147 |
Notification for Factory Act Changes: Notification to apply changes in Factory Act is pending approval from the President of India. Unless these changes are notified, the benefit of relaxed threshold in new Labour Code will not be applicable in Uttar |
State |
Department of Labour |
Any further action can be taken only after the Notification by Central/State Government. Labour codes once notified by the Government of India will repeal the Factory Act also |
|
Resolved |
148 |
Boiler: Third Party Certification / Audit in case of Boilers should not be made mandatory |
State |
Department of Labour |
As per the directions of Governemnt of India under the EODB scheme third party agency is authorized to inspect Boilers with the capacity of 1000M square heating surface. Such boilers are few in numbers |
|
Resolved |
149 |
Labour Codes: Rules for Labour codes in Uttarakhand should not be implemented |
State |
Department of Labour |
Rules for Labour Codes in the State are being drafted as per the directions of the Government of India. After incorporating suggestions/objections received from stakeholders/civil society |
|
Ongoing |
150 |
Land for ESIC Dispensaries: State has 30 dispensaries against the required 60 dispensaries. |
State |
Department of Labour |
|
|
Pending |
151 |
Performance Guarantee (Purchase Preference Policy): Demand for performance guarantee be reduced to 1% for State Micro & Small enterprises and 3% for other Commercial enterprises |
State |
Directorate of Industries |
|
|
Ongoing |
152 |
IDS : Coordinate with DPIIT to honour 554 cases pending for pre-registration / approval at DPIIT To disburse subsidy to all registration applications approved by DPIIT |
State |
Directorate of Industries |
|
|
Pending |
153 |
Input credit under GST should be allowed to hotels for the construction activities of setting up a hotel property. Tax relief in form of SGST reimbursement |
State |
Commercial Tax Department |
A separate meeting is to be scheduled at ACS, Finance level to discuss this issue |
|
Pending |
154 |
Ease conversion of agricultural lands in Uttarakhand under Non-ZA (Non Zamindari Abolition Act) category 4 to category 1 (bhoomidhari rights) and provide free conversion for Tourism sector Stamp Duty should be exempted |
State |
Department of Revenue |
|
|
Pending |
155 |
Setting up of ETPs for a cluster of industries outside notified industrial areas since MSMEs do not have funds to invest in ETPs. Monthly user charges can be charged from industries by government /ETP operator based on usage of the facility. |
State |
Directorate of Industries |
|
|
Pending |
156 |
Flexibility to Industries in Spot Zones for Change in Land use to Commercial/ Residential |
State |
HD - Mussorie Dehradun Development Authority (MDDA) |
|
|
Pending |
157 |
Reform of Contract Labour (Regulation and Abolition) Act 1970 (Act No. 37, the Year 1970) All Engineering Industries should be allowed to engage the Contract Labour in their required operations |
State |
Department of Labour |
Engagement of the Contract Labour in Engineering Industries is in accordance with the provisions of the Contract Labour (Regulation and Abolition) Act 1970 and notifications issued by the State Government from time to time |
|
Resolved |
158 |
Relaxation in employment of female workers during night shift (notification bearing 1256 (1) / VIII/ 18-91 (Labour) / 2008 dated 28th November 2018) |
State |
Department of Labour |
Permission for the same has been sought from the Government vide letter no. 339 dated 28th April 2023 |
|
Resolved |
159 |
Revision in Quarterly Overtime limit of 50 hrs (Daily 2 hrs : Weekly 12 hrs) |
State |
Department of Labour |
|
|
Pending |
160 |
Incentive Scheme for Automobile Manufacture |
State |
Directorate of Industries |
State MSME and Mega Industrial and Investment policy provides incentives for Automobile Manufacturers |
|
Resolved |
161 |
Road Widening – Kuanwala to Nakronda |
State |
Uttarakhand Public Works Department |
|
|
Pending |
162 |
Timely refund of difference between input GST w/s output GST |
State |
Commercial Tax Department |
|
|
Pending |
163 |
Start Up - Timely disbursement of Financial assistance |
State |
Directorate of Industries |
|
|
Ongoing |
164 |
Price of Pirul and Chir fruit collected should be Rs 4 per kg instead of Rs 2 per kg |
State |
Commercial Tax Department |
|
|
Pending |
165 |
Pirul mixed pellets and briquettes should be encouraged to be used instead of coal and gas in Aanchal Dairy and Mid Day Meal |
State |
Co-operative Department |
|
|
Pending |
166 |
Extraction of Lisa and Lisa products should be done online like sand, gravel etc |
State |
Uttarakhand Forest Department |
|
|
Pending |
167 |
"Leesa Policy" should be simplified & updated in lines with other States Provision of 12.5% tax should be levied on Sale of Leesa |
State |
Uttarakhand Forest Department |
|
|
Pending |
168 |
Storage license is not being issued even after completing the desired formalities of soap stone storage It should be disposed at District level |
State |
Geology and Mining Unit |
|
|
Pending |
169 |
The proposal for diversion of power line and widening of main road at Kotabagh industrial area |
State |
Uttarakhand Power Corporation Limited |
Proposal of Rs. 4.97 Cr. For construction of 24km industrial feeder for Kotabagh Industrial area has been sent to GM, District Industrial Centre, Haldwani on dated 03-05-2023 |
|
Ongoing |
170 |
Meeting of MSME Facilitation Council constituted to solve problem of pending payments should be held on regular basis at Haldwani District Industries office |
State |
Directorate of Industries |
|
|
Pending |
171 |
There is no industrial facility in Kumaon area of Haldwani which is necessary |
State |
Directorate of Industries |
|
|
Pending |
172 |
Mining work permission has not been granted by the State govt. to NB Mineral Corporation, Pithoragarh district despite paying the penalty amount and permission granted by District Magistrate, Pithoragarh due to which 3 units are lying closed: M/S Kum |
State |
Geology and Mining Unit |
The case is pending at Court |
|
Pending |
173 |
12.5 percent stamp duty was illegally deposited from the Lisa Units of Kumaon *in Uttarakhand. The amount that was wrongly charged in the challan and the bill has not been returned yet |
State |
Uttarakhand Forest Department |
|
|
Pending |
174 |
Map Approval: Problems facing by Industries outside SIIDCUL/SIDA purview |
State |
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. |
|
|
Pending |
175 |
Fire NOC: Submission of practical difficulty for obtaining fire NOC in the State |
State |
Uttarakhand Fire and Emergency Services |
Fire NOC is obtained through its departmental website www.ukfireservices.com online |
|
Resolved |
176 |
Encroachment in Industrial Areas |
State |
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. |
|
|
Pending |
177 |
Reduction of electricity rates by Rs. 1.50 per unit |
State |
Uttarakhand Power Corporation Limited |
Tariff determination is done by Honble UERC |
|
Resolved |
178 |
24 hours continuous electricty to be provided to steel industries |
State |
Uttarakhand Power Corporation Limited |
Generally, no scheduled rostering is carried out. However, to minimize the gap between demand and availability category wise rostering is done in emergency condition |
|
Resolved |
179 |
Most of the industries are engaged in authoritized area of SIIDCUL which is on lease. Bring a system wherein industries can freehold its lease based land by paying a fixed fee |
State |
Directorate of Industries |
|
|
Pending |
180 |
State Industrial Policy number 1542/VII-3-19/143-Udyog/2023 was till 31st march 2023. the new policy drafted is such that no industries will be able to established in the hilly areas |
State |
Directorate of Industries |
|
|
Pending |
181 |
New MSME policy drafted is disppointing for the enterpreneurs as it seems that the State governemnt is not interested to increase capital investment, employment and stop migration in the hilly areas |
State |
Directorate of Industries |
|
|
Pending |
182 |
New MSME policy gives 50 percent capital subsidy or INR 1 crore to micro industries established in A and B category of hilly areas within 7 years. However, enterpreneur needs capital in the beginning only. Hence, no enterpreneur will be able to set u |
State |
Directorate of Industries |
|
|
Pending |
183 |
New MSME policy drafted has no incentives with respect to transport, electricity etc. |
State |
Directorate of Industries |
|
|
Pending |
184 |
UP MSME policy is attractive and is in the interest of enterpreneurs which is absent in Uttarakhand MSME policy |
State |
Directorate of Industries |
|
|
Pending |
185 |
Land is the biggest challenge in the State and then is the map and other edit works approval. Land shall be provided at cheap rates and stability is required in rules and regulations |
State |
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. |
|
|
Pending |
186 |
Prior to the formulation of policy, a consultation workshop to be held with enterpreneurs classified in A and B category established in hilly areas |
State |
Directorate of Industries |
|
|
Pending |
187 |
In relation to the Himachal Pradesh and Uttarakhand Industrial Development Scheme 2017: Additional Extension of 2 years in the time limit of 18 months for starting the commercial production for the industries registered under the scheme |
State |
Directorate of Industries |
Central Government purview |
|
Ongoing |
188 |
Extend the time period of the scheme (Himachal Pradesh and Uttarakhand Industrial Development Scheme 2017) till March 31, 2027 |
State |
Directorate of Industries |
Central Government purview |
|
Pending |
189 |
In relation to the extension of time period for eligibility of incentives for industries set up under Mega Industrial and Investment Policy 2015: Timeline to be extended from September 30, 2022 to September 30, 2023 for industries under establishment |
State |
Directorate of Industries |
Central Government purview |
|
Ongoing |
190 |
Regarding free holding of industrial plots for industries working for 10 or more than 10 years |
State |
Directorate of Industries |
|
|
Pending |
191 |
Regarding getting rid of power roasting in industries: UPCL to fix time and inform industries in advance on the power roasting |
State |
Uttarakhand Power Corporation Limited |
Generally, no scheduled rostering is carried out. However, to minimize the gap between demand and availability category wise rostering is done in emergency condition |
|
Resolved |
192 |
Power for the 220 MW solar project alloted by the government in the state regarding establishment of Evacuation Line: UPCL to establish Power Evacuation Line for the said solar plants for power supply |
State |
Uttarakhand Power Corporation Limited |
203 MW capacity had been allotted to different developers by UREDA and as on date approx. 150 MW capacity has been commissioned. UPCL as per the requirement is constructing evacuation lines |
|
Ongoing |
193 |
Regarding maintenance and capacity increase of power sub stations at various places under Udham Singh Nagar district: UPCL to ensure regular maintenance of the power sub stations at Degree College on Bajpur Road in Kashipur, Mahuakhedaganj, Sarwarkhe |
State |
Uttarakhand Power Corporation Limited |
Work is in progress and will be completed in next 1 year |
|
Ongoing |
194 |
Regarding the development of necessary infrastructure for power distribution: UPCL to develop necessary infrastructure for power distribution to ensure uninterrupted power supply in the industries |
State |
Uttarakhand Power Corporation Limited |
Strengthening and modernization of distribution system is proposed under Revamped Distribution Sector Scheme and ADB schemes. Under these schemes construction of 33 KV substations, increasing capacity of 33/11KV substations, undergrounding of distrib |
|
Ongoing |
195 |
Regarding establishment of approved 132KV power substation on Moradabad road in Kashipur and completion of construction work of sub stations(33KV) in Rudrapur area, Kuraiya and Sitarganj |
State |
Uttarakhand Power Corporation Limited |
For construction of 33KV substation at Kuraiya tender process is under progress and part 1 has been opened Under Sitarganj, construction of 3 nos. 33 KV substations proposed at Eldeco SIIDCUL park,M/S UP Nirman Nigam is constructing these substations |
|
Ongoing |
196 |
To provide continuous power supply option to the industries in Udham Singh Nagar with respect to the applications directed by Uttarakhand Electricity Regulatory Commission |
State |
Uttarakhand Power Corporation Limited |
UPCL provides the facility of continuous supply to consumers who apply for the same |
|
Resolved |
197 |
In relation to removing problems faced by enterpreneurs under the Single Window System : Zero physical movement to the departments post submission of the application online under Single Window System. Only the concerned District Industries Centres sh |
State |
Directorate of Industries |
|
|
Pending |
198 |
Regarding the commissioning of the newly constructed ESI hospital in Rudrapur |
State |
Uttarakhand Public Works Department |
State Government is in discussion with GoI on this |
|
Ongoing |
199 |
Regarding the repair of internal roads of Eldeco SIIDCUL Industrial Park, Sitarganj to Chorgaliya and SIIDCUL Sitarganj and prevention of movement of heavy mining laden vehicles on the internal roads of SIIDCUL |
State |
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. |
SIIDCUL has initiated the process to take over ELDECO SIIDCUL Industrial Park phase- I. Process of evaluation of current state of assets is being done. After the completion of the process, SIIDCUL will take over the future O&M of SIIDCUL Eldeco. It |
|
Ongoing |
200 |
Regarding timely payment of subsidy claims, rebate in electricity bills, rebate in interest on bank loans etc. of industries established under various industrial policies in the State |
State |
Directorate of Industries |
|
|
Pending |
201 |
Regarding simplification of the difficult conditions mentioned in the notification issued on 28th November 2018 by the Govt. of Uttarakhand, General Section, to encourage women workers in the night shifts in industries |
State |
Department of Labour |
Permission for the same has been sought from the Government vide letter no. 339 dated 28th April 2023 |
|
Resolved |
202 |
Regarding timely disposal of the problems of the industries placed in the district level Udyog Mitra meetings by directing the concerned officers for timely redressal of the problems |
State |
Directorate of Industries |
|
|
Pending |
203 |
Representation by the Automobile Manufacturers in respect of the Mega Industrial and Investment Policy to be issued by the State of Uttarakhand: Reimbursement of SGST to manufacturers. Current policy highlights reimburesment of SGST only in the case |
State |
Directorate of Industries |
|
|
Pending |
204 |
Clarity on the definition of B2C in the current policy: Mega Industrial and Investment Policy |
State |
Directorate of Industries |
|
|
Pending |
205 |
Production Linked Incentives for MSME |
State |
Directorate of Industries |
|
|
Pending |
206 |
Integrated Economic Centre: To set up integrated Economic & Creative Centers in each district combining Entrepreneurship Development Centre, Skills Development, Creativity & Innovation Centre, Flatted Factory Shed Complexes and Tool Room along with |
State |
Directorate of Industries |
|
|
Pending |
207 |
Industry Academia Collaboration Cell: A cell should be established in the state to encourage industry and academic institutes collaboration |
State |
Directorate of Industries |
|
|
Pending |
208 |
Deemed Approval Implement Deemed approval provision for EoDB |
State |
Directorate of Industries |
|
|
Pending |
209 |
Incentives to promote Biomass industries in the State |
State |
Directorate of Industries |
Department may consider incorporating in the new MSME Policy |
|
Ongoing |
210 |
Conduct Capacity Building programs for district level officers on various policies / schemes |
State |
Directorate of Industries |
GM DICs & RM SIIDCUL will be apprised about new policies regularly from the head quarters |
|
Pending |
211 |
All NOCs & Renewals should be automated Auto renewals for min 3 years |
State |
Uttarakhand Pollution Control Board |
|
|
Pending |
212 |
More industries should be included in White Category Ease in procedures should be made for White Category industries |
State |
Uttarakhand Pollution Control Board |
|
|
Pending |
213 |
Transfer the power transmission line of Kotabagh industrial area |
State |
Uttarakhand Power Corporation Limited |
Proposal is received at Saashan map is being developed |
|
Ongoing |
214 |
Irregular roasting incurs huge loss to industries |
State |
Uttarakhand Power Corporation Limited |
Prior intimaton should be given about scheduled roasting |
|
Pending |
215 |
Separate Feeders for Indusrial & Residential areas should be established |
State |
Uttarakhand Power Corporation Limited |
|
|
Pending |
216 |
It is mandatory to Register under Factories Act if number of Labours is more than 10 A proposal to amend this was passed in Vidhan Sabha but order is yet to be issued |
State |
Department of Labour |
Department to double the number of Labours & release notification soon |
|
Pending |
217 |
Annual Renewals for DSO licence should be amended Department takes upfront license fees as advance for next 10 years |
State |
Department of Food and Civil Supplies |
|
|
Pending |
218 |
Separate Industrial Estate should be established for small exporting units in Roorkee |
State |
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. |
|
|
Pending |
219 |
Construction of By pass road near Ridhi Sidhi, Pantnagar |
State |
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. |
|
|
Pending |